Skimmer pool, Lisniky
Description:
Our Company has carried out the construction of a concrete pool with a capacity of 75 m3 of water.
Work carried out included:
- dismantling of old finishes;
- installation of bronze embedded elements (manufactured by Fitstar);
- lining the pool bowl with a liner;
- installation of halogen lighting;
- full selection and installation of filtering, heating, automatic disinfecting and other equipment and automation;
- installation of an automatic film covering, with the manufacture of a decorative casing on its mechanism.
Upon completion of the reconstruction, the pool was tested and put into operation.
Service is carried out by our Company with the fulfillment of all warranty obligations.