Concrete pool, Odessa

Description:

From the beginning of August to the end of September 2015, our Company completed the construction of a new concrete pool. The pool is 8 meters long, 3 meters wide and 1.4 meters deep. Works that were carried out during the construction: manufacturing of a reinforced concrete bowl with a technical room, plastering, liner cladding, installation of embedded elements, installation of the necessary equipment, lighting of the pool bowl. A drainage system was installed to drain rainwater around the outer perimeter of the pool with a separate well.