Private swimming pool in Kozin village

Description:

In November 2015, the reconstruction of a concrete pool with a capacity of 22 m3 of water was completed. Reconstruction of the pool was carried out at the global level, dismantling of old embedded elements, restoration of a concrete bowl, after which plastering work, installation of new embedded elements, replacement of hydraulic piping, installation of equipment for water purification and disinfection were performed. The cladding is made with mosaics with a selection of panels according to the customer’s sketches.

Was also performed a complex of works on preparation of drinking water for general needs of the house and replenishment of the pool. Work on drilling an artesian well, selecting equipment and installing a 6-stage water purification was carried out in parallel with the reconstruction of the pool.