Concrete pool, Brusilov
Description:
The “birth” of the pool is always a spectacular sight. The process always begins with digging a pit, then making a concrete bowl with a technical room. The next stage is the installation of embedded elements for water supply and intake, as well as the lighting of the future pool and water attractions.
The dimensions of the pool, in this case, are 10 meters long, 4 meters wide and a maximum depth of 2.2 meters, made it possible to install a water attraction – the opposite current Typhoon. The selection and installation of a pavilion for covering the pool were also made. Well, and the final stage is the filling of the beach area, followed by the laying of the decking.